Building C: The Reconstruction of the Historic Building with the Use of Selected Natural Materials

Building C 1

It is a refurbishment project completed by Atelier Starzak Strebicki in 2020. Building C is located at Plac Kolegiacki, a part of the gradual revitalization of the City Hall area. The program of this project is to reconstruct the historic building, creating a meeting place for residents of Poznań and guests visiting the city. Selected natural materials are used due to the historic character of the building.

Design

Building C 15

Building C 14

Building C 13

Building C 12

Building C 11

The existing narrow and claustrophobic surface of the ground floor can get a more spatial and public character after the walls’ demolition. This character is friendly for people with physical disabilities, ensuring multifunctionality.

This ground floor becomes a place of activity of a small cafe for a social consultations. It also opens to tourists and residents where they can meet and rest. The building and the courtyard are connected by an important element that allow spheres to penetrate and create the border between the inside and outside more flexible.

 

Rooms

Building C 10

Building C 9

Building C 8

Building C 6

Building C 7

Changing rooms and showers are designed in the basement for people on bycycles who coming to work while additional toilets can be used for employees and users of this complex. The floor space becomes more spacious thanks to the new partition walls, ensuring an improvement in work comfort as well. All levels are connected by a new common staircase. This staircase is made of concrete, replacing the existing two separate staircases, offering easier way to move around the building comfortably.

 

Materials

Building C 5

Building C 4

Building C 2

Building C 3

Building C 1

Specially selected natural materials are used for this project due to the historic character of the building. This historic character is the last stage of the new College’s construction in 1748-1751. The common spaces and corridor are finished with brick tiles.

For the bathrooms, stoneware tiles are used to beautify it while the first floor becomes more interesting with an oak floor. Furniture covered with ash veneer are also used to complement the entire look of this building.

 

Building C Gallery

 

Photographer: Danil Daneliuk

How useful was this post?

Click on a star to rate it!

Average rating 0 / 5. Vote count: 0

No votes so far! Be the first to rate this post.


Discover more from Futurist Architecture

Subscribe to get the latest posts sent to your email.

Karin Hoover

Karin Hoover

Total posts created: 3139
“Simplicity is the ultimate sophistication.” – Leonardo da Vinci

Leave a reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.