Thyssenkrupp GSS is 2016 project located in Porto Alegre and designed by National Architecture. The building consists of two-storey building and also a storage pavilion. It is used to establish GSS division, Global Shared Services of Thyssenkrupp in Latin America. The building comes with a modern interior design which is comfortable as an office, human resources, financial, and also administrative functions.

Plan

Thyssenkrupp GSS 1

Thyssenkrupp GSS 2

The plan of Thyssenkrupp GSS building is done in three different stages. This company has more than 100 employees and the building itself can house more than 200 people. It becomes an important and retrofit project for all people in the company.

 

Structure

Thyssenkrupp GSS 3

Thyssenkrupp GSS 4

The project starts with the building structure. The two largest volumes have been demolished, creating a good connection between the buildings through the new central area. This new central area is a location of the new main entrance.

 

Central Building

Thyssenkrupp GSS 5

Thyssenkrupp GSS 6

The central building not only houses the new entrance but also the new toilets. The design is made based on the large increase of the users that need to use the building. It also allows the technical area enhancement for all users.

 

Connection

Thyssenkrupp GSS 7

Thyssenkrupp GSS 8

The connection between the existing buildings of Thyssenkrupp is made by the diamond concrete of the ground floor. The ground floor is designed to be more functional rooms and available for leisure or special activities of the company.

 

Details

Thyssenkrupp GSS 9

Thyssenkrupp GSS 10

The workstation areas are increased by the metallic structure mezzanine. It is designed in the shed space of the building. The mezzanine connection is located on the second floor through the central building. The new spatial integration is created by the carpet flooring which is also creating a warm atmosphere.

 

Shed

Thyssenkrupp GSS 11

Thyssenkrupp GSS 12

The shed has its own coverage with duplicate metal tile to create an EPS internal layer. It will increase the space thermo-acoustic capacity. The external frames are replaced with the aluminum frames, The last, al meeting and coordination rooms are laminated with glass closures.

Via arquiteturanacional

How useful was this post?

Click on a star to rate it!

Average rating 0 / 5. Vote count: 0

No votes so far! Be the first to rate this post.


Discover more from Futurist Architecture

Subscribe to get the latest posts sent to your email.

Karin Hoover

Karin Hoover

Total posts created: 3145
“Simplicity is the ultimate sophistication.” – Leonardo da Vinci

Leave a reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.